Value Bank Port Aransas Renovation

Port Aransas, Texas


Owner: Value Bank


Architect: MG Architects


Scheduled Completion: February 2019


Description: Remodel of the existing Value Bank in Port Aransas after it was damaged by Hurricane Harvey. The 4,600 sf remodel consists of new interior framing for offices, all interior finishes, doors, frames,hardware, and ceilings including new mechanical, electrical and plumbing fixtures throughout. We are constructing a new entry vestibule along with modifications to the building facade and canopy systems.

New Brewster Street Southside

Corpus Christi, Texas


Owner: Brewster Street Land Holdings, Ltd


Architect: Gignac Architects


Scheduled Completion:  February 2019


Description: New construction of a metal building with interior finish out of a dining room, restaurant, bar, kitchen and restrooms. Including all interior finishes, exterior finishes, steel canopies, mechanical, electrical, plumbing, and civil work for a turnkey project.

Flour Bluff ISD Primary and Elementary Interior Renovations

Corpus Christi, Texas


Owner: Flour Bluff Independent School District


Architect: Solka Nava Torno, LLC


Scheduled Completion:  August 2018


Description: Interior renovations of the Primary and Elementary schools. Work includes asbestos abatement, demolition, finishes, ductwork, plumbing, electrical, partitions, doors and ceilings.

First United Methodist Church - Children's Building

Portland, Texas


Owner: First United Methodist Church


Architect: David Lewis Architects


Scheduled Completion: May 2018


Description: Removal of existing roof down to concrete deck. Disconnect and reconnect electrical power to mechanical units, remove and reinstall HVAC roof top units, remove and replace curbs for mechanical units, replacement of drain heads and tie in with existing roof drain system, replace TPO roofing with new Derbigum specified system.

First United Methodist Church - Worship Center

Portland, Texas


Owner: First United Methodist Church


Architect: David Lewis Architects


Scheduled Completion: May 2018


Description: Removal of existing upper bitumen roofing down to steel deck, rework of exhaust fans, replacement of roof drain heads, installation of new Derbigum roof system at and deck and parapet walls. Repair of copper cupula, spiral, replacement of all flashing materials.

Sacred Heart Church Phase III

Rockport, Texas

Owner: Diocese of Corpus Christi

Architect: David Lewis

Project Type: Addition

Square Feet: 2,633

Scheduled Completion: March 2018

Project Details: Work includes interior demolition, insulation, wood framing, drywall, suspended acoustical ceilings, porcelain floor tile, stain and paint finishes, audio systems, mechanical, electrical, and structural modifications.